Aidu Wind Farm
100 MW Aidu Wind Farm is under construction and is aimed to be completed in the year 2020. Located in northern Estonia, Aidu Wind Farm will become the biggest wind farm in the Baltic region with 30 units of Eleon 3.4 MW wind turbines.
Eleon 3.4 MW Wind Turbine
Rated output power | 3.4 MW |
Rotor diameter | 116 m |
Hub height | 122 m |
Blade tip height | 180 m |